top of page
DEWA HEAD OFFICE
About the project
Futuristic design for Dubai Electricity & Water Authority (DEWA) is all about sustainable architecture, with maximum use of daylight and solar panels.
It was created for a competition run by DEWA as they wanted to build a new Head Office in Dubai.
Concept
The way that the mass is positioned is specifically aimed in a direction that would allow taking in the most sunlight throughout the day, so that the solar panels can produce as much energy as possible.
Click to view a similar design.

PLOT AREA
20,400 SQM

FLOORS
G + 2 + 20 Floors

USE
Offices

YEAR
2016

ROLE
Architectural Design
Modeling + Rendering

STATUS
Competition
bottom of page